As we returned from camp we were notified that the gentle leak in our neighbor's toilet room had become more of a problem and we would be visited by some plumbers...
On Monday they called to let us know they would be coming.
They came on Tuesday. They needed to remove the stack (the huge pipe that takes gray water out of the building). Well, the way our landlord put together our toilet in the toilet (room), meant that they needed to remove the actual toilet. But the landlord had CEMENTED it to the floor. So they had to break it out with a hammer. (no joking).
original toilet
jackhammering the toilet & the wall
This took the entire day, but they were able to replace the pipes and others in our entrance had full access to water in both their toilet (rooms) and bathrooms. They even had to call in a welder to cut out the old stack! We had a big hole in our toilet (room) letting noxious fumes into the apartment. Nothing a plastic grocery bag can't fix.

cutting out the stack
On Tuesday night in a mad dash to buy a new toilet, I had the pleasure of selecting, transporting, and delivering our new pristine, white toilet to the apartment. This was it's own adventure as I ended up in Jim's old giguli (a Russian car) during rush hour and it had to break down because of the heat and waiting for a 100+ wagon train that stopped traffic. So 2.5-3 hours after the adventure began, the toilet was safely in our apartment.
On Wednesday, no plumbers showed up... at all. So we went 36 hours with a hole in the toilet (room).
the resulting destructionThursday they graced us with their presence all day and after nearly 11 hours we had a working toilet (brand new and already constantly running and stained from the metals in the water).
the new toilet
In the process of installing the toilet, the plumbers informed me that the landlord's poor building skills, led them to puncture a silicone covered hose under the bathtub. So the bathtub is off limits as it pours water unto the floor.
On Friday (after calling several times), Zhenya the plumber came over on his day off to fix the bathtub. One of the rubber gaskets was too old and is to blame for our continued leaking.
So after literally a week of plumbers, we have a new toilet that runs constantly and a bathtub that we cannot use. All of this with only cold water as our hot water has been turned off for nearly 3 months already!
We are smiling and absolutely thankful for the supernatural patience that God has given to us. It is really amazing that Jim and Sally's apartment is a five minute walk from ours. Otherwise, we'd be quite stinky.